ready
Mark ready
: marks a PR ready to merge. Only the Lead’s token, or the relay key. The relay checks the PR with gh, posts one comment headed Ready to merge, adds the ready to merge label, and takes the label off when a new commit lands. A PR that fails a check gets 409 and not_ready, a note with a part missing gets 400, and a gh failure gets 502. See Ready to merge.
Tokens: the relay key, and the token of the Lead. A route a token reaches can still refuse it, as the description says.
From docs/manual/relay.html#routes.
POST
Mark ready
Path Parameters
Body
application/json
JSON. The fields are in the description.
The body is of type object.